Construction of the metal frame of E10 and E11 towers
-
The construction of the metal frame of E10 and E11 towers was done based on the engineering drawings and technical specifications of the project and included material supply, cutting, assembly, welding and preparation of metal parts for installation. All production steps are carried out using specialized equipment and in accordance with the standards of metal structures construction, so that the parts in terms of dimensions, welding quality and mechanical strength fully comply with the requirements of the project.
-
In the manufacturing process, all parts are subjected to quality control, dimensional inspection and welding quality evaluation to ensure the accuracy of the operation. Adherence to production standards, use of high-quality raw materials and strict implementation of construction processes have increased the durability and stability of the structure and provided suitable conditions for quick transportation and installation of parts at the project site. The correct implementation of this part has played an important role in reducing the project implementation time and increasing the final quality of the structure.
Installing the metal frame of E10 and E11 towers
- The operation of installing the metal framework of E10 and E11 towers has started after moving the parts to the project site, and it has included placement, lifting, leveling, installation and connection of the structural members according to the executive plans. This operation was carried out using heavy cranes, specialized installation equipment and accurate measuring tools so that all components of the structure are placed in their final position with high precision.
-
Throughout the installation process, priority was given to verifying component alignment, inspecting connection quality, performing precise measurements, and adhering to safety requirements. Coordination among execution teams and meticulous planning of installation operations led to faster execution, a reduction in errors, and the achievement of the desired quality in the structure's completion. The outcome of this phase was a safe, stable structure ready for subsequent construction activities and the installation of other project components.
Execution of welded connections and structural assembly
-
The execution of welded connections and the final assembly of the structure constitute one of the most critical stages of the E10 and E11 towers project. In this phase, all metal connections were executed in accordance with welding standards and technical specifications, with quality monitored by quality control experts throughout every step. Key processes in this stage included component preparation, preliminary assembly, welding, cleaning, and final inspection.
-
The use of skilled personnel and appropriate equipment, combined with strict adherence to technical parameters, has enhanced the structural strength and integrity. Furthermore, the implementation of quality controls and continuous inspections has ensured the proper performance of connections under applied loads and operational conditions. The correct execution of this phase has played a vital role in improving safety, durability, and the structure's service life, thereby guaranteeing the project's final quality.
Quality Control and Completion of the Steel Structure
-
Quality control and the completion of the steel structure constituted the final stages of the E10 and E11 towers project, carried out to ensure full compliance of construction activities with the project drawings, technical specifications, and standards. This phase encompassed dimensional inspections, weld quality control, connection checks, the rectification of potential defects, and final assessments prior to the handover of the structure.
-
Alongside quality control, structural completion activities—including the installation of ancillary components, the preparation of various sections for subsequent construction stages, and the coordination of execution tasks—have been carried out. This process has enhanced structural reliability, minimized the need for post-installation modifications, and established favorable conditions for the continuation of construction work. Adherence to technical standards and continuous quality control are key factors in the project's success and the achievement of a safe, durable structure.
Project image gallery

E10 and E11 towers
E10 and E11 Towers Project
The E10 and E11 Towers Project is one of the prominent civil and building construction projects, carried out for Khademin Shahrdari as the client and Shahrnegar Khaneh Saz as the project contractor. The project was undertaken to support urban infrastructure development and the construction of high-rise structures. The scope of work included the fabrication and installation of structural steel components in full compliance with engineering standards, technical specifications, and safety regulations. Every phase of the project was executed through careful planning, the use of specialized equipment, and the expertise of experienced technical personnel to ensure the highest levels of structural quality, strength, and construction accuracy.
The execution scope comprised the fabrication of steel members, assembly, structural connections, transportation of fabricated components to the project site, on-site steel erection, and comprehensive quality inspections throughout all stages of construction. All activities were performed in accordance with approved engineering drawings and internationally recognized structural steel standards. Continuous quality assurance, inspection of structural connections, and strict adherence to health, safety, and environmental requirements were maintained throughout the project to ensure reliable and durable performance.
The successful completion of the E10 and E11 Towers Project reflects the company's capabilities in the fabrication and installation of structural steel systems for large-scale civil and building developments. The project further demonstrates the company's experience in delivering high-rise construction projects while maintaining superior standards of quality, safety, and engineering excellence.