Construction and installation of metal frames with welded joints
- 1389
- تهران
Employer Contractor Completion Construction of metal skeletons The fabrication of steel frameworks is the initial stage in the construction of industrial and building structures, carried out in accordance with engineering drawings and manufacturing standards. This process encompasses material procurement, cutting, drilling, assembly, welding, quality control, and the preparation of components…
Nirou Daryayi Sepah
Poosha Sazeh
Construction of metal skeletons
-
The fabrication of steel frameworks is the initial stage in the construction of industrial and building structures, carried out in accordance with engineering drawings and manufacturing standards. This process encompasses material procurement, cutting, drilling, assembly, welding, quality control, and the preparation of components for transport to the project site. All fabrication operations are performed using specialized machinery and precision equipment to ensure that the components meet technical specifications regarding dimensions, weld quality, and mechanical strength.
-
During the manufacturing process, all parts are subjected to dimensional controls, welding inspection and quality tests to ensure their full compliance with the executive drawings. Also, the correct implementation of production processes will reduce installation errors, increase execution speed and improve the final quality of the structure. The use of expert manpower and modern equipment provides the possibility of manufacturing all kinds of columns, beams, wind braces, industrial platforms and other metal structure components with high precision and provides the context for the implementation of large industrial and construction projects.
Installation of metal frames
-
The operation of installing metal skeletons is considered one of the most sensitive stages of the implementation of industrial projects and plays a decisive role in the stability and proper functioning of the structure. At this stage, the manufactured parts are aligned and connected to each other after being transported to the project site using cranes and specialized equipment at the designated installation location. All the installation steps are carried out according to the executive plans and technical instructions so that the structure is in the optimal condition in terms of geometry, strength and safety.
-
Implementation of installation operations requires detailed planning, coordination of executive teams and full compliance with safety requirements. Controlling the alignment of parts, checking the quality of connections, adjusting the level of the structure and performing final inspections are among the most important stages of this process. In addition to increasing the speed of the project completion, the correct implementation of the installation operation will reduce the implementation costs and create a suitable platform for the installation of industrial equipment and the safe operation of the complex.
Project image gallery

Construction and installation of metal frames with welded joints
Steel Structure Fabrication and Installation with Welded Connections
The Steel Structure Fabrication and Installation with Welded Connections project represents one of the most significant execution activities in industrial, civil, and construction projects. It is carried out with the objective of delivering durable, stable, and structurally reliable steel frameworks in full compliance with engineering standards and project specifications. The entire process, from material procurement and fabrication to assembly, welding, transportation, and on-site installation, is performed in accordance with technical requirements and comprehensive quality control procedures. Utilizing skilled professionals, advanced fabrication equipment, and standardized production processes plays a vital role in enhancing structural quality while optimizing project execution time.
The project encompasses the fabrication of steel components, execution of welded connections, dimensional inspections, quality assurance, surface preparation, transportation of fabricated members to the project site, and final installation in accordance with approved engineering drawings. All welded joints are executed in compliance with recognized welding standards and are continuously supervised by quality control specialists to ensure the structural integrity, durability, and operational safety of the completed steel framework. The use of specialized lifting equipment, precision alignment tools, and modern installation techniques improves installation accuracy while minimizing potential execution errors. Successful completion of such projects demonstrates the company's expertise in the fabrication and installation of heavy steel structures for the steel, oil and gas, petrochemical, power generation, and large-scale civil construction industries.