Construction and installation of metal frame with welded joints – Kuban Kav project
- 1390
- تهران
Employer Contractor Completion Metal frame construction The construction of the metal skeleton is one of the main stages of the Kuban Kav project, which was carried out using the executive plans and technical specifications of the project. This section includes material supply, cutting, assembly, welding and manufacturing of metal parts…
Sayol
Poosha Sazeh
Metal frame construction
- The construction of the metal skeleton is one of the main stages of the Kuban Kav project, which was carried out using the executive plans and technical specifications of the project. This section includes material supply, cutting, assembly, welding and manufacturing of metal parts required for the structure. All parts are produced in the factory environment using specialized equipment and before being sent to the project site, they have been subjected to strict dimensional and quality controls to ensure their full compliance with the project standards.
- In the construction process, compliance with welding standards, use of high-quality raw materials and continuous inspections have increased the strength and durability of the structure. Also, all the parts are made in such a way that the transportation and installation operations are done with minimum time and maximum accuracy. The correct implementation of this step has played an important role in the final quality of the project, reducing implementation errors and increasing the speed of completion of installation operations.
Metal frame installation
- The metal framework installation operation of the Kuban Cave project has started after the parts were transferred to the execution site and included placement, lifting, leveling, installation and connection of the structural members according to the executive plans. This operation was carried out using heavy cranes, specialized installation equipment and experienced executive forces so that all components of the structure are placed in their final position with high precision.
- During the installation operation, alignment control, connection quality check, level adjustment and technical inspections have been carried out continuously. Adherence to the schedule, coordination of executive teams and strict implementation of safety instructions have led to the successful completion of this part of the project. The result of the correct implementation of the installation operation was the creation of a stable structure ready for the installation of equipment and safe operation of the complex.
Implementation of welding joints
- The implementation of welded joints is one of the most important stages of the Kuban Kav project and has played an essential role in the strength and integrity of the metal structure. All welding operations are carried out by experts and in accordance with valid industrial standards, and the quality of connections has been controlled and evaluated at all stages.
-
This process includes parts preparation, initial assembly, welding, cleaning, visual inspection and, if necessary, non-destructive tests to confirm the quality of the joints. Adherence to technical parameters, use of standard consumables and strict quality control have increased the resistance of joints against operating loads and environmental conditions. The correct implementation of this part, in addition to ensuring the safety of the structure, has increased its useful life and reliability during the operation period.
Surface preparation and protective coating of the structure
-
After the completion of the construction and installation operations, the surface preparation process and the implementation of protective coatings have been carried out in order to increase the durability of the structure. This stage includes cleaning the surfaces, sandblasting, removing contamination and rust, applying the lining layer and applying the final color according to the technical specifications of the project. Proper preparation of the surface increases the adhesiveness of the coating and improves its protective performance in operating conditions.
-
The application of industrial coatings using paints resistant to corrosion, moisture, and environmental conditions ensures effective protection of the metal structure and reduces future maintenance and repair costs. All coating application stages are carried out under the supervision of quality control experts, with the thickness, uniformity, and final quality of the coating evaluated in accordance with project standards. In addition to extending the structure's service life, this process guarantees a suitable appearance and ensures durability under various operating conditions.
Project image gallery

Construction and installation of metal frame with welded joints – Kuban Kav project
Steel Structure Fabrication and Installation with Welded Connections – Kooban Kav Project
The Steel Structure Fabrication and Installation with Welded Connections for the Kooban Kav Project was executed with the objective of delivering a robust, safe, and structurally reliable steel framework in full compliance with engineering standards and project specifications. The project encompassed all phases of execution, including detailed engineering implementation, fabrication of steel components, assembly, welding, transportation, on-site installation, and quality control. By utilizing specialized equipment, advanced installation techniques, and experienced technical personnel, the project was completed with a high level of precision and workmanship. The implementation of standardized fabrication and installation procedures not only enhanced the overall quality of the structure but also reduced construction time and facilitated efficient project execution.
Throughout the project, all fabricated steel components were subjected to comprehensive quality inspections before being transported to the construction site. Installation activities were carried out using heavy lifting equipment, precision measuring instruments, and specialized machinery to ensure accurate positioning and alignment of all structural members. Every welded connection was executed in accordance with approved technical procedures and continuously monitored by quality control specialists to guarantee the structural strength, stability, and operational safety of the completed framework. The successful completion of this project demonstrates the company's expertise in the fabrication and installation of heavy steel structures, effective management of complex installation operations, and delivery of engineering services for industrial and civil projects while maintaining the highest standards of quality, safety, and technical excellence.
Pushagroup of Satman cooperation